coal bin
常见例句
- August 28, with the Coal Bin, chief engineer at the regular meeting hosted technical work.
8月28日,同煤集团总工程师于斌主持召开技术工作例会。
www.qy7788.com.cn - In the paper, the part-presser horizontal mechanical coal bin and analysis method of its vertical presser are introduced.
本文提出一种结构简单的分压式水平机械煤仓,并给出其有关参数的计算方法。 - Introduce the grouting reinforcement method of the soft rock of coal bin and fall area and analyze the fall reasons and the grouting result.
介绍了煤仓软岩及冒落段预注浆加固方法,分析了冒落原因及注浆效果。 返回 coal bin