restrike
常见例句
- Die should contain a minimum of one idle station to accommodate future design considerations. i.e. restrike cam pierce etc.
摸具应至少包含一个空站以适应未来的设计变更,回整,凸轮,冲孔等。 - Die should contain a minimum of one idle station to accommodate future design considerations. i.e. restrike, cam pierce, etc.
所有模具入子耐磨的地方必须使用镶嵌以方便经济的维修,置换以及根据料厚的变化调整能力。 - In a10kV distribution system,when shunt ca-pacitors are switched off by vacuum circuit breakers,restrike overvoltage often occurs.
电力系统中使用真空断路器切除无功补偿用并联电容器时,容易产生重燃过电压,严重影响并联电容的安全运行。 - Theoretical development and of the blank and simulation of drown and restrike,we need to see the green color in the simulation drow before building the die.It's very important.
在制作模具之前我们理论上应该制作一个白模来模仿一下冲压效果来看看绿颜色的定位。这很重要。 - All dies containing a restrike station should have a parallel under restrike station. Pararllel should have a minimum width to cover entire restrike area.
在有回整工步的地方,必须有一个垫脚支撑,垫脚最小宽度应该覆盖回整区域。 - Du Bin, Zhao Feng, Gao Yadong et al.Study of restrike overvoltage when switching off shunt capacitors in a 10kV distribution system[J].High VoltageApparatus, 2004, 40(4): 255-258.
[8]杜斌;赵峰;高亚栋;等.;10kV系统中切除并联电容器时的重燃过电压研究[J] 返回 restrike